CLADDING INSTALLATION (CI)

Product Description

The training on MF involves - preparing the shapes of the actual concrete works using metal forms and fixing of timber strata to support the formwork, prior to casting of the concrete as per the given working drawing, this includes comprehension of the technical drawing, use of appropriate metal forms and fixing of the wooden members as per the requirement of the drawing.